Weekly Road & Lane Closures on Pacific Coast Highway (PCH) & Topanga Canyon for Palisades Fire repair work Feb. 23 – March 1
PCH FROM TEMESCAL CANYON RD TO CARBON BEACH TERRACE
Current conditions:
• Temescal Canyon Rd–Sunset Blvd: Reduced speed, 35 mph, cones/signage
• Sunset Blvd–Carbon Beach Terrace: Active work zone, possible single-lane closures, 25 mph
• Crews may set up additional single-lane closures weekdays 9 AM–3 PM.
PLANNED/POTENTIAL PCH WORK ZONES:
• Ventura County Line–Carbon Beach Terrace: Trancas Canyon Rd–Guernsey Ave & Corral Canyon Bridge repairs; possible nighttime closures
• South of Las Flores Canyon Rd–Sunset Blvd: Fire-damaged roadway, drainage, electrical & slope repairs; lane closures as needed, weekdays 9 AM–3 PM
• Carbon Canyon Rd–Topanga Canyon Blvd (SR-27): SCE trenching
– NB PCH closed: 4 AM–3 PM weekdays, 4 AM–4 PM weekends, 9 PM–6 AM daily
– SB PCH closed: 9 AM–5 PM weekdays, 4 AM–4 PM weekends, 9 PM–6 AM daily
• South of Big Rock Dr: Catchment wall construction; NB lane closed daily 9 AM–3 PM
• South of Topanga Canyon Blvd–Sunset Blvd: Slope repair/culvert cleanup; NB reduced to one lane as needed, 9 AM–3 PM
• Coastline Dr–Porto Marina Way (near Getty Villa): Retaining wall work; NB lane closed daily 9 AM–3 PM
• Sunset Blvd to ~¼ mi north: Castellammare Mesa landslide drilling; nightly 10 PM–6 AM NB PCH closed, traffic shifted to SB lanes
TOPANGA CANYON BLVD — PCH TO GRAND VIEW DR
• Closed to motorists nightly midnight–5 AM
• One-lane traffic w/ pilot car (PM 2.5–2.8) for Caltrans emergency work, 5 AM–11:59 PM daily
• One-lane traffic for SCE trenching (Old Topanga Canyon Rd–south of Happy Trail), weekdays 8:30 AM–4:30 PM
• One-lane traffic for SCE electrical work (Highvale Trail–Happy Trail), Sun–Thu nights 9 PM–5 AM
For more information, visit the project website.