News Flash Home
The original item was published from 2/13/2026 12:47:20 PM to 2/20/2026 4:40:13 PM.

News Flash

Home - News Carousel

Posted on: February 14, 2026

[ARCHIVED] Caltrans Weekly Road & Lane Closures: PCH & Topanga Canyon Week of Feb. 16-22

Caltrans Road and Lane Closures on PCH and Topanga Canyon, Feb 16-22 (340 x 500 px)

๐Ÿšง PCH & Topanga Canyon Boulevard (SR-27) Traffic Update – Week of Feb. 16

No construction work will take place on Monday (Feb. 16) due to the holiday — however, traffic control restrictions on Topanga Canyon remain in effect.


๐ŸŒŠ Pacific Coast Highway (PCH)

๐Ÿ“ Temescal Canyon Rd (Pacific Palisades) to Carbon Beach Terrace (Malibu)

Current Conditions:
• Reduced speed (35 mph) between Temescal Canyon Rd & Sunset Blvd
• Active work zone (25 mph) from Sunset Blvd to Carbon Beach Terrace
• Single-lane closures possible 9 a.m.–3 p.m., Tuesday–Friday

Ongoing Work Includes:
• Fire damage roadway repairs
• Bridge, drainage & slope repairs
• Edison trenching operations (daytime, overnight & weekend lane closures)
• Retaining & catchment wall construction

Expect delays. Plan extra travel time and consider alternate routes.


Topanga Canyon Blvd (SR-27)

๐Ÿ“ PCH to Grand View Drive

• Closed to the public midnight–5 a.m. daily (including the holiday)
• One-way traffic control with pilot car 5 a.m.–midnight daily
• Additional one-way control for Edison trenching 8:30 a.m.–4:30 p.m., Tue–Fri

โš ๏ธ Use caution around blind curves and one-way sections.


Closures are weather-permitting and subject to change.
๐Ÿšฆ Check Caltrans QuickMap for real-time conditions.
๐Ÿšจ Fines may be doubled in work zones.

Additional Info...