Documents & Resources

Building Sanitary Sewer Lateral Construction Guidelines

A Building Sanitary Sewer Lateral (Sewer Lateral) that is properly installed and maintained will reduce the risk of sanitary sewer overflows and backup by minimizing inflow and infiltration into the sewer system, as well as minimize blockages due to pipe failure or root intrusion. The Sewer Lateral Construction Guidelines establish requirements to connect with the CCWTF.

FINAL DESIGN REPORT

ENVIRONMENTAL IMPACT REPORT (EIR)

On January 12, 2015, the City Council held a public hearing and adopted Resolution No. 15-05 adopting the Findings of Fact required by the California Environmental Quality Act (CEQA), certifying the EIR and Erratum No. 1, and adopting a Statement of Overriding Consideration and Mitigation Monitoring and Report Program.

The Final EIR, Erratum No. 1 to the Final EIR, Draft EIR, & Recirculated Draft EIR are available for review at Malibu City Hall. Contact the Planning Department at 310-456-2489, ext. 374, to request a CD. (State Clearinghouse Number 2013111075).

View the full EIR.

Water Quality Monitoring Data

The City has prepared reports which present the results of groundwater and surface water monitoring activities for the Civic Center Water Treatment Facility (CCWTF).

  1. 2018
  2. 2017
  3. 2016
  4. 2015

MAPS

OTHER RESOURCES

MEETINGS & PUBLIC HEARINGS

City Council conducted several public hearings in the process of approving the Civic Center Water Treatment Facility project. For a complete list of meetings and related reports, including Planning Commission and Coastal Commission hearings, contact the Planning Department.